Evaluacion De Proyectos.
Enviado por 5559630743 • 15 de Octubre de 2012 • 441 Palabras (2 Páginas) • 256 Visitas
Industrial Maintenance Engineering.
English.
Lic. Elva Hernández López.
10IMIG1.
Héctor Cortes Vera.
Luis Alberto Damian.
Oswaldo Flores.
Rubicel Alcantara Lafuente.
Processing Enginee (rubicel)
Good afternoon. I have a problem with the lubricated pump. Can you help me? Please.
Expert Technician (oswaldo)
Yes, sure! What is your specific problem?
Processing Engineer: (rubicel)
I have a failure in the GENERATOR ELECTRIC. I don’t know if was by lack lubrication or because longer works the lubricated pump. Do you can send me a Maintenance Engineer, right now?
Expert Technician: (oswaldo)
Yes, of course. Now I communicate with him and send him.
Processing Engineer: (rubicel)
Ok. Thanks.
Expert Technician (oswaldo)
Good afternoon, I call because it presented a problem in the generator electric. Do you can go to with the Processing Engineer? Please.
Maintenance Engineer: (hector)
Yes, I go immediately.
Expert Technician (oswaldo)
Ok. Bye.
Maintenance Engineer: (hector)
Good afternoonEngineer. What is your problem?
Processing Engineer: (rubicel)
The generator electric it has a failure. I think that lubricated pump is failing and it is damaged something elements of the machine by lack of lubrication.
Maintenance Engineer: (hector)
Good. I go calling to staff (calling).
Staff (damian)
Hi, Can I help you!
Maintenance Engineer: (hector)
I´m MaintenanceEngineer, Do you can be presented here with the processing? Please.
Staff (damian)
Yes of course.
Maintenance Engineer: (hector)
There is a problem in the lubricated pump of the generator.
O.k. the first that we must is deenergize the panel, after that we need check that there isn’t current. After wards we should disconnect the generator electrical and we need verify lubricated pump and change the lubricate and elements damaged and we have checked andwe make analisys if the lubricate is indicated to that the pump working, after we have reconnected the all system and determinate if the equipment is workings adequately.
What is your opinion to improve this problem?
Staff (damian)
Yes sure, I have a new alternative would be the change the kind of lubricant or change of lubricated pump and this reducing the Maintenance costs, and we make that the machine work properly.
Maintenance Engineer: (hector)
Good idea.
Processing Engineer: (rubicel)
We should make an analysis of the lubricants and we have determinate which is the adequate.
Maintenance Engineer: (hector)
O.k. your problem is solved.
...