ClubEnsayos.com - Ensayos de Calidad, Tareas y Monografias
Buscar

PANEL SOLAR (version En Ingles)


Enviado por   •  30 de Agosto de 2011  •  1.462 Palabras (6 Páginas)  •  1.230 Visitas

Página 1 de 6

SOLAR PANEL PROJECT

SERGIO HERNANDEZ GUTIERREZ

ALVARO JOSE HERAZO VEGA

OBJECTIVE

Implement the use of solar power generation through solar radiation.

justification

The world is ending, let us extend our stay over there.

Our project is called the solar panel.

The project aims to harness the energy of solar radiation.

A solar panel consists of photovoltaic cells that convert light into

electricity.

These panels can be used in electric cars and solar boats.

This project is a bit expensive for our community, the cost is 3.7 to 7

dollars per watt installed , for example a 20w panel costs about $250. It is also noteworthy that the energy produced depends on the size of Selda, the light intensity and exposure time

panels are composed of crystalline silicon, when exposed to direct sunlight a

cell measuring 6 cm in diameter can produce a current of 0.5 volts which is

equivalent to 9watts per square meter.

The project pretends will be carry mainly in warm areas, in order to harness the

power of direct sunlight and thus contribute to environmental improvement of

energy production.

CPM

1. costs for the contemplate of project (2 weeks)

2. trade investigation staff(4 weeks)

3. assignation of the recourses(3 weeks)

4. location of the place(5 weeks)

5. visit the place(4 weeks)

6. socio-environment studies(1 weeks)

7. location of the material work(2 weeks)

8. trade of the worker(4 weeks)

9. execute of the project(12 weeks)

UNIT TWO

1. The speed to take it to market is a bit slow and that this project can only be carried out in very hot, as is a bit expensive as not many people can access it, but we believe a time of about 1 year .

2. It is a product of very good quality as it contributes to improving the environment, and will be made with the finest materials.

3. Costs are a little high, but the benefit is great we are talking of 3.7 dollars per watt installed.

4. The design is a large flat solar panel, and settles to the extent of the user.

5. The product is essentially the same for all households do not change much, there's a new solar panel design that could improve our product and is the solar panel in 3D, but is very expensive for a home.

6. Initial testing was done in an open place where sunlight comes directly, therefore verifying the location of the house where it will be installed in order to see if you can access the service. At least it is verified that receive direct sunlight and has an average solar radiation of 4.7 kWh / mm / day.

UNIT 3

1. Decide what sort of products are to be manufactured at the new plant

The main aims consists in the transformation of sunlight on electric energy, here the raw material is the sunlight, it is absorbed for the solar panels.

2. Plan the layout and the design of the site for the new plant

We have an office in the outside of city, that function with solar energy, there the people could acquire our product and see the

Operation of the solar panel.

3. Determine the most advantageous and efficient deployment of the machinery you are going to use

The installation of photovoltaic system consists in a generator group conformed for a extension of panels a charge controller and an investor.

We going to use cars to transportation the materials for its installation.

4. Determine the placement and the flow of the raw materials, components, and machine parts that will be brought into the plant.

We have only raw materials that it´s solar radiation, the machine that we use is the panels its components: Photovoltaic cells are the core of the solar panel. They are made up of at least two layers of semiconductor material (usually pure silicon infused with boron and phosphorous).

5. Draw up lists of the personnel that will be required to run the plant efficiently and write brief job descriptions for different categories of workers.

environmental engineer: is responsible for coordinating the operation of the project and to seek improvements

electrical engineer: his function is to coordinate the installation of the project.

Publicist: its function is to promote solar energy use and accessibility to it

secretary's office: its function is to receive all applications and arrange .

Manager : its function is coordinating the sales (public accountant)

installation staff: are responsible for transporting the material of work and installation work in each house

6. outline any special safety issues or procedures that are relevant

...

Descargar como (para miembros actualizados) txt (9 Kb)
Leer 5 páginas más »
Disponible sólo en Clubensayos.com