Segmentar Costos Semivariables
Enviado por Jose Manuel Moreno Hernandez • 13 de Septiembre de 2018 • Tarea • 377 Palabras (2 Páginas) • 588 Visitas
[pic 1]
NOMBRE:
JOSE MANUEL MORENO HERNANDEZ.
MATRICULA:
13000055
MODULO:
CONTABILIDAD ADMINISTRATIVA.
METODOS PARA SEGMENTAR COSTOS SEMIVARIABLES
PROFESOR DEL MODULO:
ING. Y C.P. JOSE CANDELARIO LOPEZ OLIVO.
FECHA:
07 DE SEPTIEMBRE 2018.
Automotriz Galván & Uribe, Co.
Método Punto Alto – Punto Bajo.
07 de septiembre 2018.
Datos Financieros últimos seis meses.[pic 2]
[pic 3]
Horas | Costo | |
Punto Alto | 20 | $1,250.00 |
Punto Bajo | 9 | $800.00 |
|
| |
Diferencia | 11 | $450.00 |
Tasa Variable | = | $450.00 | = | $40.91 | X Hora | COSTO VARIABLE |
11 |
Dónde: | ||
CF= | Costo Fijo | |
CV= | Costo Variable | |
CT= | Costo Total | |
CF=CT-CV | ||
CF= | $1,250.00 - | ($40.91X20) |
$1,250.00 - | $818.20 | |
=$432.00 | ||
CT=CF+CV (Horas) | ||
CT= | $432.00+ | $40.91(16) |
$432.00+ | $654.56 | |
=$1,086.56 |
Automotriz Galván & Uribe, Co.
Método Mínimos Cuadrados.
07 de septiembre 2018.[pic 4]
Y | X | X2 | XY | |
Observaciones | Costo Total Mantenimiento | Horas de Reparación | ||
1 | $800.00 | 9 | 81 | 7200 |
2 | $1,200.00 | 20 | 400 | 24000 |
3 | $950.00 | 15 | 225 | 14250 |
4 | $900.00 | 12 | 144 | 10800 |
5 | $1,050.00 | 18 | 324 | 18900 |
6 | $1,250.00 | 20 | 400 | 25000 |
Sumatoria: | $6,150.00 | 94 | 1574 | 100150 |
b= | 6(100150)- | (94)6150 | / 6(1574)- | (94)2 | ||
b= | 600900- | 578100 | / 9444 - | 8836 | ||
b= | 22800 | / 608 | ||||
b= | $37.50 | Costo variable por hora | ||||
a= | (6150) | (1574) - | (94) | (1000150) | / 6 (1574) - | (94)2 |
a= | 9680100- | 9414100 | / | 9444 - 8836 | ||
a= | 266000 | / 608 | ||||
a= | $437.50 | Costo Fijo |
CT=CF+CV (Horas) | ||
CT= | 437.5+ | 37.5(16) |
CT= | 437.5+ | 600 |
CT= | $1,037.50 | Costo Total |
Automotriz Galván & Uribe, Co.
Método Diagrama de dispersión.
07 de septiembre 2018.[pic 5]
Horas | Total de Costo |
9 | $800.00 |
20 | $1,200.00 |
16 | $1,086.56 |
15 | $950.00 |
12 | $900.00 |
18 | $1,050.00 |
20 | $1,250.00 |
[pic 6]
[pic 7]
[pic 8]
[pic 9]
Determinación del Gerente Costo/Horas laboradas. | ||
Horas | Total de Costo | |
18 | $1,050.00 | |
20 | $1,200.00 |
...