ANALISIS AREAS TRIBUTARIAS
A1=25.82 A2= 60.17 A3= 66.03 A4=31.68
A5= 49.72 A6=114.69 A7=127.86 A8=60.39
A9=49.95 A10=81.07 A11=89.86 A12= 61.28
A13= 26.55 A14= 20.65 A15= 32.57 A16= 32.57
EVALUACION CARGA ULTIMA DE LAS LOSAS [pic 15][pic 16][pic 17]
DISEÑO DE COLUMNAS PERIMETRALES
- CARGA ULTIMA DE DISEÑO (C4-IN)
PU=(WU LOSA)(AT) = (2047)(58.74)= 120,241 KGS
- CALCULO DE AREA DE CONCRETO
AC= PU/.70(.85F´C+PFY) = 120,241 / .7(.85*200 + 0.02*4200)= 676 CM ² = 26x26 = 30x30
- CALCULO DE AREA DE ACERO EN COMPRESIÓN
AS= F b d = (.02)(30)(30) = 18 SE PROPONE VR#6
VR= AS/AVR = 18/2.87 = 6.2 = 7VR#5
- CALCULO DE SEPARACION ENTRE ESTRIBOS[pic 18]
16 Θvr= 16(1.91)= 30.56 = 30cm[pic 19]
48 Θ est = 48(.95) = 45.6cm[pic 20]
Dim min = 35cm
SE COLOCAN ESTRIBOS #3 @ 30CM
- CARGA ULTIMA DE DISEÑO (C4-PA)
PU= 120,241 + (1816)(58.74) + 1.2(.30)(.30)(5)(2400)= 242,246KGS
- CALCULO DE AREA DE CONCRETO
AC= PU/.70(.85F´C+PFY) = 242,246 / .7(.85*200 + 0.02*4200)= 1363CM² = 36.9X36.9 = 40X40CM
- CALCULO DE AREA DE ACERO EN COMPRESIÓN
AS= F b d = (.02)(40)(40) = 32 SE PROPONE VR#6[pic 21]
VR= AS/AVR = 32/2.54 = 11.14 = 12VR#6[pic 22]
- CALCULO DE SEPARACION ENTRE ESTRIBOS[pic 23]
16 Θvr= 16(2.54)= 40.6 = 40cm
48 Θ est = 48(1.59) = 76.32cm
Dim min = 55cm
SE COLOCAN ESTRIBOS #5 @ 40CM
- CARGA ULTIMA DE DISEÑO (C4-PB)
PU= 242,246 + (1614)(58.74) + 1.2(.40)(.40)(5)(2400)= 364,791KGS
- CALCULO DE AREA DE CONCRETO
AC= PU/.70(.85F´C+PFY) = 364791 / .7(.85*200 + 0.02*4200)= 2052CM² = 45.29X45.29 = 50X50CM
- CALCULO DE AREA DE ACERO EN COMPRESIÓN
AS= F b d = (.02)(50)(50) = 50 SE PROPONE VR#8
VR= AS/AVR = 50/5.07 = 9.86 = 10VR#8
- CALCULO DE SEPARACION ENTRE ESTRIBOS[pic 24]
16 Θvr= 16(2.54)= 40.6 = 40cm[pic 25]