ClubEnsayos.com - Ensayos de Calidad, Tareas y Monografias
Buscar

Configurar MRP


Enviado por   •  21 de Septiembre de 2023  •  Trabajo  •  885 Palabras (4 Páginas)  •  40 Visitas

Página 1 de 4

Your first (very simple) MRP run using Re-order Point planning

By Willem Hoek


This post is for some of you who have never done a MRP run on SAP and want to get a very simple example going. 

Simple steps 

  1. create material (or change existing) 
  2. View current stock on hand 
  3. Run MRP for the material 
  4. Evaluate MRP run (View results of MRP run)

Step 1 -- Create / change material 

Transaction mm01 (create material) or mm02 (change material) if material exist 

Ensure that material is created with at least the following views: Basic data, purchasing, MRP 1, Storage, Accounting. Enter Plant / Sloc as required. 

The key information for this demo is the MRP screen. Here is the one that I created. 

Este post es para algunos de ustedes que nunca han hecho una carrera de MRP enSAP y quiere obtener un ejemplo muy sencillo ir.

sencillos pasos
1. crear material (o cambio actual)
2. Vista actual de las acciones en la mano
3. Ejecución de MRP para el material
4. Evaluar MRP run (Ver resultados de MRP de ejecución)
Paso 1 - Crear / cambio de material

Transacción MM01 (crear material) o mm02 (material de cambio) si el material existe

Asegurar que el material se crea con al menos las siguientes opiniones: los datosbásicos, compras, MRP 1, de almacenamiento, Contabilidad. Entrar en la planta /SLOC cuando sea necesario.

La información clave para la demo es la pantalla MRP. Aquí es la que he creado.
[pic 1] 

The key MRP parameters are the 
MRP Type and Lot Size

MRP Type - Defines when the rule used to determine WHEN the PR or Planned Order will be be created. 
Lot size - Determine calculation to be used to determine the QUANTITY in the PR or Planned Order 

For my simple demo I will use standard SAP MRP type = V1 and Lot size = HB 

For V1 (Manual reord.point w. ext.reqs 
) a re-order point must be spesified, make ROP = 100. 

For HB (Replenish to maximum stock level) a maximum level must be spesified, make Max value = 1000. 

Step 2 -- View current stock on hand. 

For this you can use 
Stock Requirement List (MD04) 

Los principales parámetros de MRP son el tipo de planificación de necesidades ytamaño del lote.

Tipo de MRP - Define cuando la regla utilizada para determinar el momento en la Orden de relaciones públicas o planeado se va a crear.
Superficie del terreno - Determinar cálculo que se utilizará para determinar la cantidaden la Orden de PR o planificada

Para mi demostración simple que se utiliza estándar de SAP MRP type = V1 y el tamaño de lote HB =

Para V1 (Manual reord.point ext.reqs w.
) Un punto de re-orden debe ser spesified, hacer ROP = 100.

De HB (reponer el nivel máximo de existencias) un nivel máximo debe ser spesified,hacer que el valor máximo = 1000.

Paso 2 - Vista actual de las acciones en la mano.

Para ello se puede usar la Lista de archivo Requisito (MD04)


[pic 2] 

Make sure that your ROP is higher than your current stock on hand, otherwise MRP willl not create any documents. In this case Stock on hand (20) < ROP (100), so MRP will suggest you purchase stock. 

...

Descargar como (para miembros actualizados) txt (5 Kb) pdf (288 Kb) docx (197 Kb)
Leer 3 páginas más »
Disponible sólo en Clubensayos.com