ID | Type | Name | Cause | Effect | Owner | Likelihood | Financial Impact | Schedule Impact | Current Rating | Current Controls / Treatment Plan Overview | Response ID | Response Title | Response Status | Response Owner | Response Due Date | Response Comments |
13000 | Risk | Development of 511C LV Contract | Suitable time frame for Construction | Unable to accomplish Commissioning dates; | Bill Cravens | Likely | Serious | Critical | Extreme: 24 | Ensure a proper coordination between the parties involved for key work areas | 13245 | Ensure contractor to increase manning levels; | In Progress | Gustavo Cerna | 15-02-14 |
|
13246 | Introduce nighshift for 511C | In Progress | Gustavo Cerna | 28-02-14 |
| |||||||||||
12981 | Risk | Late delivery of pipework, platework and spools by FIMA | FIMAs fabrication ratio not aligned to Project requirements; Materials can not be found in Peru; | Impact on 501 SMP Schedule and Mechanical Completion date; | Bill Cravens | Almost Certain | Moderate | Major | Extreme: 23 |
| 13247 | Discuss with Cosapi SMP and FIMA new delivery dates required as per schedule | In Progress | Bill Cravens | 31-01-14 | 31-Jan-14 On going |
12360 | Risk | Camp capacity not aligned to Project ramp up | Camp expansion not sufficient to hold new contract packages manpower (e.g. 533, 511C, 509) | Inability to mobilise personnel impacting schedule; | Jonathan Gunnel | Likely | Serious | Major | High: 21 | Daily coordination meeting to prioritise camp allocation; Weekly meeting for camp issues between Hudbay, Ausenco and Stracon; | 13241 | Complete Camp Expansion 3 | In Progress | Jonathan Gunnell | 15-03-14 | 26-Jan-14 Ausenco completing Camp expansion 3 design. Camp will hold 576 workers and will be ready mid March. |
10790 | Develop Camp Projection Manpower | In Progress | Jonathan Gunnell | 31-01-14 | 14-Jan-14 Currently under development by JG. | |||||||||||
10667 | Discuss with Contractors to ensure the prioritisation of workers prior mobilisation | In Progress | Jonathan Gunnell | 31-01-14 | 18-Dec-13 On going. Beds are assigned in conjunction with Hudbay if necessary | |||||||||||
12189 | Risk | Storage explosive buildings not ready when required | Late changes to contract strategies; Late commencement of civil, assembly and electrical works; Late delivery of final design and structures; | Delay issuing permits for explosives; Impact on schedule (pre-striping activities) | Bill Cravens | Likely | Serious | Major | High: 21 | Follow up with TMI | 13191 | Complete Magazine Construction Schedule and discuss with Hudbay | In Progress | Simon Beddow | 30-01-14 | 31-Jan-14 On going |
13271 | Develop an schedule for the assembly and electrical works; | In Progress | Roy David | 28-02-14 |
| |||||||||||
10910 | Engage contractor for assembly and electrical works | In Progress | Simon Beddow | 15-01-14 | 26-Nov-13 Building have shipped and on the way to site. Erection drawings are not completed. Schedule is not finalised. For permitting, Electrical drawings are required. Fire suppression system not defined. | |||||||||||
13236 | Expedite Procurement and arrival of Fire Water Pumps | In Progress | Nicola James | 31-01-14 | 31-Jan-14 On going | |||||||||||
11834 | Risk | Delay to Commissioning due to Power Transmission Line is not ready | Delay in starting works on Bay5 in Tintaya substation; Delays completing negotiations with Chilloroya Community; | Impact to Commissioning Schedule; Major cost impact; | Ron Cook | Almost Certain | Major | Major | High: 20 | Monitor Abengoa contractor progress; Abengoa weekly reports | 11012 | Evaluate Progress of Socabaya Titnaya line and Tintata to Constancia Powerline | In Progress | Ron Cook | 15-01-14 | 26-Jan-14 Discussion last week with Tesure they completed there last 4 Right of Ways. It was guaranteed that the Tintaya substation would be energized by April 1 2014. |
9830 | Pursue negotiations with land owners for right of ways (ABENGOA) | In Progress | Ron Cook | 30-07-13 | 26-Jan-14 Currently negotiating with Chilloroya Community for the right of ways. It is the last community to negotiate with. | |||||||||||
12982 | Risk | Late arrival of E-rooms to site | E-rooms fabrication schedule not aligned with Construction schedule; Priorities not well defined | Impact on Commissioning schedule | Eugene Kanciar | Almost Certain | Moderate | Serious | High: 20 | Ausenco supervisor dedicated to review and expedite progress fabrication | 13256 | Review if E-rooms arrival dates are aligned to Commissioning schedule | In Progress | Barry Howell | 10-02-14 |
|
13260 | Siemens to present recovery plan for electrical rooms 300,500,600,700 | In Progress | Rafael Fonseca | 10-02-14 |
| |||||||||||
12801 | Risk | Permanent Laboratory not ready for completing Pre-stripping analysis | Late development of Laboratory facilities; Late award of Laboratory contractor; | Unable to properly identify NAG, PAG and verify ore content; Cost impact sending samples outside of the mine for testing; | Bill Cravens | Almost Certain | Moderate | Serious | High: 20 |
| 11180 | Engage contractor responsible to complete civil works and installation of structures | In Progress | Simon Beddow | 31-01-14 | 13-Jan-14 Civil works engaged with Cosapi Civil to commence 09 Feb and finish 12 Mar. |
11181 | Expedite award of Laboratory Contractor | In Progress | Javier Toro | 28-02-14 | 13-Jan-14 Not priority due to the delay of the assembly of Permanent Laboratory | |||||||||||
11179 | Expedite delivery of structures to site for Laboratory construction | In Progress | Pierre Boulangger | 31-01-14 | 26-Jan-14 All structures to be delivered to site by Jan 26th. | |||||||||||
13194 | Implement Temporary Laboratory Plan | In Progress | Javier Toro | 07-03-14 |
| |||||||||||
12377 | Risk | Unable to Operate Permanent Fuel Facility on schedule | Construction delays in Permanent Fuel Facility; Delays signing contract with Primax; Delays completing Bench and Access roads prior Primax contract commencement; Permitting process taking from 6 months | Project is restricted to using only Temporary fuel Facility to supply equipment; Unable to meet equipment peak load; | Eric Moser | Almost Certain | Serious | Serious | High: 20 |
| 13192 | Complete Expansion of Temporary Fuel Station | In Progress | Steven Ngatai | 15-02-14 | 26-Jan-14 Expansion of temporary griffo underway - completion date 10/02/14 |
10993 | Define fuel capacity required during Ops | In Progress | Graeme Walsh | 31-12-13 | 07-Dec-13 To confirm final number. To be validated. | |||||||||||
10741 | Expedite Primax contract approval | In Progress | Andres Silva | 31-01-14 | 26-Jan-14 The contract was divided in to two areas: Engineering and Construction. The Engineering component was signed and issued on November 2013. | |||||||||||
11171 | Submission, follow up and approval of Permit | In Progress | Fernando Montero | 01-02-14 | 27-Jan-14 In order to start permitting, engineering needs to be completed. | |||||||||||
11206 | Risk | Delay to obtain Operation license for plant (Beneficiation Concession) | Major observations during MINEM Inspection due to significant changes to design and as built; Delay in Construction Schedule; Water Licenses not approved on time; Design submitted at BC does not match as built construction | Delay in Operations, Start up and Loss of Revenue | Terry Linde | Unlikely | Critical | Critical | High: 19 | Monitor construction progress; Monitor that Surface & Underground Water Licenses ares obtained as scheduled; | 9751 | Define date to request BC Authorization and Inspection by the MINEM | In Progress | Fernando Montero | 06-12-13 | 21-Jan-14 No observations have been posed by the evaluator up to this date regarding this matter. |
10987 | Risk | Unable to meet required Tailings and Water Capacity according to ramp up at required dates | Delay in Stracon execution of the TMF East and Water Collection Structures; Aggressive Schedule; Delay of Cunahuiri Reservoir; | Impact to Production Schedule; Project is required to stop after completing Wet Commissioning; | Graeme Walsh | Unlikely | Critical | Critical | High: 19 | Complete construction of structures according to Water Collection Strategy; Continue collecting water at MSP through culvert 5; | 13250 | Capture NC4 water and diver to TMF Sed Pond 1 | In Progress | Steven Ngatai | 15-02-14 | 26-Jan-14 Stracon is setting up a system to capture water from the NC4 to pump water to the TMF sed pond # 1 and then transfer to TMF. 509 contract will handle all other water transfers. |
13162 | Purchase and install piping system to capture and transfer water from Bog Dam to TMF East | In Progress | Steven Ngatai | 30-04-14 | 26-Jan-14 Collecting only localized run off at BOG Dam. | |||||||||||
10334 | Risk | Inconsistency between Crisis Management Plans on site | Multiple plans from contractors and client | Late response to crisis events | Eric Caba | Possible | NIL | NIL | High: 18 |
| 11167 | Define fuel buffer | In Progress | Eric Caba | 31-12-13 |
|
7450 | Develop a unique Site Crisis Management Plan | In Progress | Eric Caba | 31-03-14 | 19-Nov-13 Central Crisis Response Plan is being finalized. One crisis simulation has been done with a portion of the management team using the process. A second simulation and the completion of the tier II action plans is scheduled for the second week of January 2014. The EPCM has been included in the current revision and a draft has been delivered to Konrad Litfin for review. | |||||||||||
11166 | Meeting to define acceptable Project risk | In Progress | Eric Caba | 31-12-13 |
| |||||||||||
12803 | Risk | Unable to access Constancia Mine Pre-stripping area | Late development of HR03 construction | Delays to commence Pre-stripping stage | Javier Toro | Possible | Moderate | Major | High: 18 |
| 11185 | Develop and finalise HR03 | In Progress | Steven Ngatai | 07-03-14 | 26-Jan-14 Haul Rd 3 currently on schedule. |
12807 | Risk | Unable to access NAG Loading Areas | CR1 in front of NAG Dump delayed | Delays completing pre-stripping | Javier Toro | Possible | Moderate | Major | High: 18 |
| 11191 | Complete CR1 section in front of NAG Dump by February 2014 | In Progress | Steven Ngatai | 28-02-14 | 26-Jan-14 CR1 currently on target for NAG dumping |
11613 | Risk | Unable to complete WRF Containment Pond to collect water during Wet Season 13-14 | Wet season causing delays and reworks during clay placement; | Unable to collect sufficient water for Start-up; | Graeme Walsh | Possible | Major | Major | High: 18 |
| 10223 | Complete Construction of NC4 to divert water and allow WRF containment pond construction | In Progress | Steven Ngatai | 31-12-13 | 06-Dec-13 Expedite procurement of valves for CC1 & CC5 |
13209 | Expedite clay works to raise embankment above ground level | In Progress | Steven Ngatai | 31-01-14 |
| |||||||||||
11170 | Expedite procurement of valves for CC1 & CC5 | In Progress | Scott Beattie | 31-12-13 | 30-Jan-14 Valves procured and have pre-delivery inspection. | |||||||||||
12389 | Risk | Unable to place PAG at Waste Rock area | Restricted access to PAG Areas for development; Community Relocation delays | Late development of Mine Prestrip; Late Ore Commissioning | Graeme Walsh | Possible | Major | Major | High: 18 |
| 13238 | Complete new design for PAG Storage due to remaining houses in the area | In Progress | Scott Beattie | 31-01-14 | 30-Jan-14 Stage 1 of PAG facility agreed, no community land issues. |
10897 | Complete relocation to Quimsachata area | In Progress | Nino Coppero | 31-12-13 | 31-Jan-14 On going | |||||||||||
8829 | Risk | Accidents involving project related traffic and community | Increased traffic; Narrow roads; Weather conditions; Road conditions | Accidents on the road to the project; Injuries; Personnel in the community are negatively impacted by project activity | Jonathan Gunnel | Likely | Moderate | Serious | High: 17 | Monitor the compliance of Project Code of conduct and Grievance Procedure; Monitoring Compliance with the provisions of RITRA; Monitor Road Condition from Espinar to Site; Weekly Traffic Safety Committee Meetings; | 10803 | Implement a maintenance Program of Road from Espinar to Site after wet season | In Progress | Ron Cook | 31-03-14 | 26-Jan-14 Jim Gannon Construction Manager at site is evaluating the road conditions and when possible will initiate road repairs. |
11195 | Risk | Insufficient lightning protection on site for workforce | Weather Conditions | Major Injuries; Work stoppages | Daniel Carey | Likely | Serious | Serious | High: 17 | Ensure Workforce remains close the workfront at refugees | 13249 | Implementation of Lightning Shelters | In Progress | Daniel Carey | 15-02-14 | 26-Jan-14 Further 20 foot and small lightning shelters are being built. |
12806 | Risk | Late development of Coya Pampa Quarry Area according to WRF Loading plan | Relocation delays; | Impact to Loading Plan; TMF zone A core construction; Estability issues during Operations; | Javier Toro | Likely | Moderate | Serious | High: 17 |
| 11189 | Deliver status of resettlement to Operations | In Progress | Nino Coppero | 31-12-13 |
|
8863 | Risk | Managing and meeting community expectations related to equipment supplied by the community to the Project | Currently Project not renting light & heavy vehicles from Communities as agreed; Not following local procurement Procedure | Community workers complains; Strikes; Work stoppage; | Guillermo Reyes | Likely | Minor | Minor | High: 17 | Continue to execute contracts with local suppliers assuming all documentation is in place. Enforce cancellation clauses when encounter unresponsive supplier; Giant at Chilloroya delivering Servicing to community Equipment | 10960 | Prioritize renting community owned vehicles than subleased vehicles | In Progress | Maria Elena Vinatea | 31-12-13 |
|
12414 | Risk | Package 509 system not ready when required by schedule | Scope change; Delay in award, contract approval by client | Late package completion; Impacts on water harvesting | Michael Wright | Likely | Moderate | Serious | High: 17 |
| 10867 | Facilitate client involvement in process; | In Progress | Michael Wright | 30-11-13 | 26-Jan-14 Options being reviewed with client for possible additional harvest system from NC4 to TMF East. |
11050 | Risk | Unable to meet with required clay production in order to meet with Construction requirements | Clay humidity content greater than design specs; Late finalisation of relocation program of community personnel; Lack of sufficient resources; Wet season; | Delays of TMF East and WRF Containment Pond embankment Construction; Late commencement of Water collection on TMF East; | Graeme Walsh | Likely | Serious | Serious | High: 17 | Direct placement of Core Material (Clay) source, using grizzly screens. | 8762 | Hudbay to expedite finalisation of agreements and relocation program | In Progress | Nino Coppero | 31-05-13 | 25-Nov-13 A total of 7 agreements are pending. Hudbay will deliver the land to the Community after Quimsachata works are completed and also to the families to be relocated. |
10819 | Planning for installation of Trommel in Coya Pampa (PAD III) | In Progress | Scott Beattie | 15-12-13 | 26-Jan-14 Trommel is on site. Final components for trommel are due on site by end of Jan | |||||||||||
12355 | Risk | EPCM personnel turn-over | Other projects starting up in the area. Current staffing is being targeted in Arequipa with more appealing packages being offered | Loose of EPCM personnel; Time and cost for recruitment; | Bill Cravens | Almost Certain | Moderate | Moderate | High: 16 | Continue improving Camp, food, laundry and general site conditions; | 11178 | To develop retention Plan | In Progress | Bill Cravens | 15-12-13 | 31-Jan-14 On going |
8851 | Issue | Project site personnel turn-over (alliance skilled labour) | Other projects starting up in the area. Current staffing is being targeted in Arequipa with more appealing packages being offered | Loose of skilled personnel; Productivity HSE risks due to turn over. Skilled Labour attracted to competing projects | Graeme Walsh | Almost Certain | Moderate | Moderate | High: 16 | Change of recruitment strategy, recruiting personnel from Cusco, Lima, Cajamarca and other cities; Stracon pulling operators from other projects where they have operations; Stracon improving camp conditions and accommodation; | 11174 | Review and communicate staffing Plan | In Progress | Steven Ngatai | 15-01-14 |
|
10336 | Risk | Catastrophic failure of the dam (TMF) during Construction | Dam Failure; Unseasonal Rain; Foce Majure event | Major Project delay; | Graeme Walsh | Rare | Critical | Critical | Medium: 15 | Ensure proper Quality Control during the Construction; Follow TMF Design criteria; |
|
|
|
|
|
|
10713 | Risk | Impact of heavy haulage to communities | Communities unaware of large shipments through their communities; Lack of proper communication with the communities; | Community protests; Community dissatisfaction; | Jonathan Gunnel | Unlikely | Moderate | NIL | Medium: 14 | Work closely with Acoinsa and Hudbay Community Relations on the transport of overdimension equipment; Procedure in place for Communication of Heavy Haulage to Hudbay and Communities; Following Protocols for shipping; Weekly logistics meetings with Hudbay; |
|
|
|
|
|
|
12802 | Risk | Lack of space for placing Top soil from Pit and WRF | Crusher in Top soil deposit area | Delays to commence Top soil removal from Pit and WRF areas | Javier Toro | Unlikely | NIL | Major | Medium: 14 |
| 11183 | Define capacities required for TOP Soil from Pit and WRF | In Progress | Steven Ngatai | 28-02-14 | 26-Jan-14 Crusher has been relocated and topsoil embankment construction well advanced |
12303 | Risk | Owner FOREX risk | Fluctuation of rate soles per dollar; | Impact to Project Contingency | David Madsen | Unlikely | Major | NIL | Medium: 14 | Owner purchased S/. to hedge FOREX risk to cover future CF. |
|
|
|
|
|
|
8842 | Risk | Protests by local communities interrupting site work program and/or causing injuries or damage to equipment | Failure to deliver on commitments; Miss-information or misconceptions within the community; Contractors not aligning with project commitments; | Deterioration of project reputation; Stop of construction activities; Impact to Productivity | Guillermo Reyes | Unlikely | Major | Serious | Medium: 14 | Deliver on community commitments; Monthly grievance meetings established with communities.; Monitor contractor compliance with Project Social Policies. |
|
|
|
|
|
|
12361 | Risk | Ability of existing catering to meet with ramp up requirements | STP limitations, potable water and camp catering included | Retention issues due to poor performance of camp catering; Schedule delay | Karina Soraluz | Possible | Serious | Moderate | Medium: 13 |
| 10815 | Expand Construction Camp Dining Room | In Progress | Jonathan Gunnell | 30-11-13 | 18-Dec-13 Proposal being submitted to client on 18-12-13 - already agreed in principle |
11619 | Risk | Collapse or failure of structures such as dumps, walls (excluding TMF) | Not following Design criteria; Temporary structures are not designed and placed without geotechnical supervision; Use of incorrect materials; Heavy wet season | Re-works; Potential safety issue for personnel; Damage to equipment; Environment impact; Delayed schedule and production; | Graeme Walsh | Possible | Moderate | Moderate | Medium: 13 | Ensure all structures are built following design signed off under QAQC; | 10711 | Identify all unsuitable areas that require additional works to avoid collapse or failure | In Progress | Steven Ngatai | 31-03-14 | 26-Jan-14 Constructing in close consultation with KP design Engineers |
11175 | Monitoring Plan during wet season | In Progress | Steven Ngatai | 31-03-14 | 26-Jan-14 Supervisors monitoring and reporting on daily basis | |||||||||||
8828 | Risk | Contractors interacting with Communities could create social distress | Workforce entering local communities seeking recreational services, or creating short term non sustainable businesses/impacts. | Project falls into the focus of NGO and other welfare parties; Project disruption; Community distress | Nino Coppero | Possible | Serious | Serious | Medium: 13 | Drive contractor compliance with the Hudbay code of conduct; Support communities; Continuously monitoring compliance of project protocols. | 10787 | Distribution of Project Code of Conduct to Companies based in Communities (i.e. Chilloroya, Ucchucarco, Velille) | In Progress | Guillermo Reyes | 30-11-13 |
|
8876 | Risk | Customs clearance delays | Delay due to sequential clearance of Vigencia; Additional requirements by Custom Agents; | Delay delivery of equipment to site; Demurrage charges; Delay of critical path equipment to site; Acceleration cost | Hayley Mori | Possible | Moderate | Serious | Medium: 13 | Liaise with vendor to ensure all technical information has been provided; Monitor on daily basis customs broker and customs clearance process, arrange meeting between supplier; Customs broker to ensure all technical information is accurate and available and forwarded to Customs to accomplish timely customs clearance; Timely documents review to identify cargo special conditions; Evaluate tools available to avoid payment of duties. Plan ahead if the equipment is subject to duties, or is 0 rated. Vigencia is suitable for large capital items; |
|
|
|
|
|
|
11053 | Risk | Delays due to lack of Filter/Blanket Drainage material | Geotechnical conditions; Crusher failures; | Delays in Construction of TMF east; Schedule delay; Cost Increase | Graeme Walsh | Possible | Serious | Moderate | Medium: 13 |
| 10987 | Crusher 1 to produce filter drainage | In Progress | Scott Beattie | 31-01-14 | 30-Jan-14 Importing sand material. Corporaque to blend with non-conforming filter |
10782 | Exploring options in conjunction with KP about material supply and specs | In Progress | Steven Ngatai | 30-11-13 | 25-Nov-13 Currently project can’t meet with filter drainage KP specs. | |||||||||||
12200 | Risk | Late completion of Civil Works for Process Plant Substations | Lack of Siemens civil subcontractor; Lack of a contingency plan; Unreliable subcontractor; Siemens not closing negotiations with Cosapi Civil to continue with concrete civil works at Substations; | Impact on commissioning schedule; Interface between civil and electrical subcontractors; | Gustavo Cerna | Possible | Moderate | Serious | Medium: 13 | Change civil subcontractor | 10965 | Develop and send recovery plan for civil works | In Progress | Marco Romero | 31-01-14 | 06-Dec-13 On going |
12391 | Risk | Uncontrolled discharge to the environment from Plant Construction Ponds (Process, Contact and Tailings Ponds) | Late arrival of equipment and instruments to regulate discharge; Late construction and installation of equipment and instruments; | Discharge to the environment; Fines by regulator; | Angel Cuba | Possible | Serious | NIL | Medium: 13 |
| 13171 | Complete installation and skimmers and piping before end of Jan | In Progress | Adriana Ferreyra | 31-01-14 | 31-Jan-14 On going |
10827 | Expedite arrival of skimmers and hoses to site | In Progress | Adriana Ferreyra | 27-01-14 | 20-Nov-13 ETA site end of December | |||||||||||
6273 | Risk | Uncontrolled storm water run-off during Construction | Rain and/or saturated material close to a river course | Fines; Environmental impact; Reputational impact | Edwin Ruiz | Possible | Serious | NIL | Medium: 13 | BMPs have been installed; Contractors to monitor discharges and direct water to approved sediment ponds; Diversion channels around TMF construction area are being upgraded; Contractor to identify any recent uncontrolled discharges as an ongoing task; | 10990 | Implement Storm Water Management Plan for EPCM areas and structures | In Progress | Adriana Ferreyra | 31-01-14 | 31-Jan-14 On going |
10898 | Stracon working with KP and Hudbay to implement control measures | In Progress | Steven Ngatai | 15-12-13 | 26-Jan-1 On going improvement to surface runoff managemnet | |||||||||||
12282 | Risk | Failure to deliver structural steel according to schedule | Fabrication delays by TMI; Vendor not supplying documentation correctly; Lack of management support from Ausenco and TMI; | SMP Contractor (ECI) burning hours on site without materials to start construction | Enrique Vasquez | Likely | Moderate | Moderate | Medium: 12 | Site to continuously review and change priority for fabrication; TMI rep on site; Task force and daily monitoring; | 10684 | Maintain record of man hours delayed due to lack of structural steel | In Progress | Adriana Seccombe | 31-12-13 | 31-Jan-14 On going |
12808 | Risk | Increased quantities of Barge platforms and accesses | Lack of design; | Cost increase; Schedule impact; | Michael Wright | Likely | Moderate | NIL | Medium: 12 |
| 11193 | Change Notice to be submitted | In Progress | Michael Wright | 31-12-13 | 26-Jan-14 No currrent change |
11192 | Finalise design | In Progress | Michael Wright | 31-12-13 | 26-Jan-14 Design is finalised from Ausenco and quantities considered. Contractor to provide proposals in 3 areas once mobilized. | |||||||||||
12386 | Risk | Unforeseen Engineering issues (EPCM) | Design completed in multiple areas; Overlapping of systems engineering completed is multiple cities; | Design re-works; Delays to T&M Contractors; | Yuri Gallo | Likely | Moderate | Moderate | Medium: 12 |
| 10806 | Identify all interfaces and interferences (including above ground piping) | In Progress | Yuri Gallo | 30-11-13 | 31-Jan-14 On going |
10808 | Implement new Field engineering modifications (Procesfor SI) | In Progress | Yuri Gallo | 30-11-13 | 31-Jan-14 On going | |||||||||||
10807 | Increase Site Engineering Team | In Progress | Yuri Gallo | 30-11-13 | 31-Jan-14 On going | |||||||||||
11204 | Risk | Major injury or fatality(ies) on site during Construction | Breach of Safety Standards; New Personnel to Mining activities; Rotation of personnel | Stop of Construction activities due to Investigation; Fines to the Project | Eric Moser | Rare | Serious | Moderate | Medium: 10 | Following HSEC procedures; Monthly audits to contractors; Vigilance and keeping high level on safety; Permanent field reinforcement; | 10893 | Implement a one standard HSE system across the project to reduce any disparities in standards | In Progress | Daniel Carey | 31-03-14 | 26-Jan-14 Hudbay are developing site wide procedures, but Ausenco will have input into the procedures |
11835 | Risk | Completion of C2 (Wet Comissioning) without Water License in place | Water License is not yet approved and wet Commissioning is required to commence to let Contractors demobilise from site; Chamaca district communities applied for prior consultation | Ministry requests to stop operations until Water License is granted | Fernando Montero | Unlikely | Serious | Serious | Medium: 9 |
|
|
|
|
|
|
|
12332 | Risk | Contractors workforce demands resulting in strikes and/or delays to the construction schedule | Better working conditions/additional compensations requested by Contractors workforce | Strikes; Delays to the construction schedule; Extra costs due to T&M contract | Roger Tremblay | Unlikely | Serious | Serious | Medium: 9 | Continue improving Camp, food, laundry and general site conditions | 10805 | Define list of additional amenities for workers over the weekend | In Progress | Jonathan Gunnell | 30-11-13 | 18-Dec-13 Recreation improvement facility proposal to client on 18-12-13. |
12809 | Risk | Impact on transportation to site by development on Xstrata Road demonstrations | Demonstration in area of Corporaque; Road blockages | Late delivery of equipment and materials to site; Community issues; | Ron Cook | Unlikely | Serious | Serious | Medium: 9 | Social monitoring in the area through Espinar Stakeholders |
|
|
|
|
|
|
12359 | Risk | Lack of adequate management of T&M Contracts | Ausenco Team not having adequate resources to manage T&M Contractors (SMP - E&I) | Cost and Schedule Impact; | Bill Cravens | Unlikely | Serious | NIL | Medium: 9 |
| 10775 | Identify what positions are not yet fulfilled according to current Orgchart | In Progress | Angel Cuba | 31-12-13 | 31-Jan-14 On going |
12805 | Risk | Late development of NAG Facility Construction | Stracon construction delays; Focusing on other critical areas | Delays completing Pre-stripping | Javier Toro | Unlikely | Serious | Serious | Medium: 9 |
| 11187 | Ensure Proper Water Management structures are constructed | In Progress | Steven Ngatai | 31-01-14 | 26-Jan-14 NAG embankment construction and underdrains progressing, no delay invisaged |
12121 | Risk | Lower than planned plant availability due to lack of spare parts | Critical, commissioning and operations spares not on site when required | Impact to Commissioning / Production Schedule | Eric Moser | Unlikely | Serious | Serious | Medium: 9 |
| 10217 | Define if Failure mode and effect analysis should be undertaken in order to identify which spares should be purchased from vendor recommendations | In Progress | Eric Moser | 31-12-13 |
|
11182 | Review spare parts list with Hudbay (Commissioning) | In Progress | Marcus Gee | 31-12-13 | 17-Dec-13 Current matrix under development for review of all Commissioning and operational spares ordered. | |||||||||||
11836 | Risk | Non-compliance with approved Discharge Permit (Control Points, Quality of discharge, Discharge flow) | Modification of a control point for discharge; Discharge Points not meeting Quality parameters; Modification of Treatment System (additional ponds) | Environmental fines; Reputational impact; | Edwin Ruiz | Unlikely | Serious | NIL | Medium: 9 | Contractors continue developing Environmental audits and monitoring discharges | 12981 | Assess if Permit needs to be modified | In Progress | Fernando Montero | 20-12-13 | 21-Jan-14 Hudbay will coordinate with Ausenco the amendment to the discharge permits of the treatment plants |
10123 | Discussion with authority about control points | In Progress | Fernando Montero | 05-12-13 | 21-Jan-14 These discussions will be postpone because there are other permits under evaluation | |||||||||||
10899 | Ensure all Stracon discharges are completed from TMF Sed Pond 1 | In Progress | Scott Beattie | 05-12-13 | 30-Jan-14 TMF Sed Pond 1 is operational without instrumentation | |||||||||||
11176 | Ensure all Stracon discharges are completed from TMF Sed Pond 2 | In Progress | Scott Beattie | 31-12-13 | 30-Jan-14 TMF Sed Pond 2 will be operational without instrumentation at end of Feb | |||||||||||
12982 | Installation of Flowmeters at authorised discharge points | In Progress | Adriana Ferreyra | 15-02-14 |
| |||||||||||
12983 | Installation of Flowmeters at authorised discharge points | In Progress | Scott Beattie | 31-12-13 | 30-Jan-14 Environmental team looking at materials to procure as the client requires | |||||||||||
11629 | Risk | Discharge of acidic water to the environment | Presence of acidic water at north contact pond, ROM Pad and DM3; Underdrainage developed under Process Plant area; | Environmental fines; Additional construction PAG Pond is required | Julio Roncal | Possible | Moderate | NIL | Medium: 8 | Complete monitoring to identify any PAG water; DMs water management | 9840 | Complete Construction of Sub drainage system | In Progress | Adriana Ferreyra | 30-01-14 | 02-Jan-13 Pending decision by Hdbay |
9839 | Complete design of sub drainage system | In Progress | Yuri Gallo | 28-02-14 | 25-Nov-13 Design to be completed at site. Resources to be allocated. | |||||||||||
10822 | Purchase and installation of pumps to pump water back to the North Pond | In Progress | Yuri Gallo | 15-12-13 | 31-Jan-14 On going | |||||||||||
11205 | Risk | Overall Project Site Security breaches | Unauthorised access to site by third parties | Theft or damage to equipment; Injuries to personnel | Eric Moser | Possible | Moderate | NIL | Medium: 8 | Security company on site responsible for site security. | 10816 | Allocate additional security officers at Camp Construction | In Progress | Eric Moser | 30-11-13 |
|
8883 | Risk | Environmental incidents associated with management of waste during construction phase | Inadequate management of domestic and construction waste materials; Ladfill not yet constructed; | Fines; Reputation impact; Community protests | Julio Roncal | Rare | Moderate | NIL | Low: 6 | Waste management planning; Monitoring compliance with the Plans and waste management procedures |
|
|
|
|
|
|
8846 | Risk | HudBay blamed for environmental impacts caused by illegal mining activities | Illegal miners increasing mercury level in the water. | OEFA focusing its attention to Constancia Project | Luis Zapata | Rare | Minor | NIL | Low: 6 | Follow Environmental Monitoring Plan and Water Monitoring Program; | 8100 | Initiate Data Analysis of water quality | In Progress | Julio Roncal | 30-06-13 | 09-Nov-13 The baseline is on going since 2008, monitoring network has been improved |
8101 | Review study results and confirm potential responsibilities | In Progress | Julio Roncal | 30-07-13 | 09-Nov-13 Final Golder report during next month | |||||||||||
8848 | Risk | Loss of long lead critical path equipment in transport | Road transport damage; | Major schedule impact due to need to reproduce multiple pieces of equipment. | Hayley Mori | Rare | Serious | Minor | Low: 6 | Provide logistics contractor with clear instructions; Hold Kick Off Meeting prior to each Operation to ensure risks are identified; Use shipping companies of short transit |
|
|
|
|
|
|
12358 | Risk | EPCM staff personnel turn-over | Other projects starting up in the area. Current staffing is being targeted in Arequipa with more appealing packages being offered | Loose of Staff; Time and cost for recruitment; | Bill Cravens | Unlikely | Moderate | NIL | Low: 5 | Improve Site Conditions |
|
|
|
|
|
|
8873 | Risk | Political interference impacting project development | Regional elections in 2014 - build up in 2013. | Protest action, negative focus on project - Project falls into focus of NGO | Carlos Castro | Unlikely | Moderate | Moderate | Low: 5 | Monitor political developments; Community engagement and communication | 5595 | Establish agreed means and protocols for monitoring political situation and maintain regular monitoring | In Progress | Carlos Castro | 31-12-13 | 25-Oct-13 No high risk alert has been triggered so far |
12080 | Risk | Unable to properly manage Warehousing and Lay down areas on site | Lack of storage planification; Bertling doesnt have enough equipments for storage proccess in multiple areas; | Loss of equipments and tools; Delays on constructions; Interfaces between contractors; Demurrage costs from trucks; | Philip Flanagan | Unlikely | Moderate | Moderate | Low: 5 |
|
|
|
|
|
|
|
12118 | Risk | Dewatering wells not meeting water requirements for startup due to uncertain amount of water to be found on wells | Previous study design not accurate; Field conditions different from initial design assumptions of pumps; Uncertain amount of water on wells | Water from Dewatering wells can not be considered as a Contingency Plan in case there is not enough water accumulated in other ponds; Reworks; Cost increase; Impact on schedule | Michael Wright | Possible | Minor | Minor | Low: 4 | Currently only following Hudbay Memo and Golder design; Ausenco is considering a contingency budget for extra works required in case not finding sufficient water | 10422 | Complete drilling to determine amount of water available | In Progress | Michael Wright | 28-02-14 | 26-Jan-14 Drilling ongoing. Water quantities unknown until wells installed. |
8853 | Risk | Late issue of the detailed design drawings for construction | Late finalisation of design | Pressure on procurement, Logistic and Construction management teams; Fast track decision making; Impact in cost and schedule | Mark Dodds | Rare | Moderate | Moderate | Low: 3 | Remove holds from drawings in advance of the design drawings being required for fabrication and construction. | 5566 | Confirm final design delivery date | In Progress | Mark Dodds | 30-07-13 | 26-Sep-13 Ausenco´s engineering is being transferred from Brisbane to Lima. KP engineering is at 99% |
11838 | Risk | Landfill to be costructed on a different location than the one specified in original EIA while EIA Amendment 2 is not yet approved (End of 2014) | Landfill has changed location and will be constructed by a different subcontractor and on a different timeframe than specified in approved EIA | Regulator stops work and imposes penalties; Partially delay in construction; | Jason Orr | Rare | Minor | NIL | Low: 1 |
|
|
|
|
|
|
|
12804 | Opportunity | Delay in Construction of a portion of CR1 | Use of mining fleet | Cost reduction | Eric Moser | Almost Certain | Minor | NIL | Medium Opportunity: -11 |
| 11186 | Stracon completing survey and determining cost savings | In Progress | Steven Ngatai | 31-12-13 | 26-Jan-14 Not seen as an opportunity in CR1 as needs to be complete for NAG dumping |
...