Tesoro Petroleum
Enviado por freebad14 • 14 de Marzo de 2013 • 611 Palabras (3 Páginas) • 455 Visitas
Tesoro Petroleum
22-MW CHP Application
Quick Facts:
LOCATION: Salt Lake City, Utah
TOTAL PROJECT COST: $25,000,000
MONTHLY ENERGY BILL SAVINGS: $200,000
EQUIPMENT: 2 Solar Titan Turbines and 2
Rentech Heat Recovery Steam Generators
FUEL: Natural Gas & Refinery Fuel Gas
USE OF THERMAL ENERGY: Steam Generation
FACILITY SIZE: 145 Acres, 200 employees
FACILITY PEAK LOAD: 15 MW
FACILITY AVERAGE LOAD: 14 MW
CHP IN OPERATION SINCE: May 2004
ENVIRONMENTAL BENEFITS: Greenhouse gas emissions reduced by more than 500 tons per year
Site Description:
Constructed in 1908 and operated under the UTOCO and Amoco brand names, the Salt Lake City refinery was acquired by San Antonio based Tesoro Petroleum Corporation in September 2001. Tesoro Petroleum Corporation, a Fortune 500 Company, is an independent refiner and marketer of petroleum products and provider of marine logistics services. The 55,000-barrel per day Salt Lake plant serves the growing hub of the Intermountain West. The refinery produces
gasoline, diesel fuel, and propane that are sold into the high-growth markets of Utah and Idaho. The refinery also supplies jet fuel to Salt Lake City International Airport and the U.S. Air Force bases in Utah and Idaho. The Tesoro refinery is an active participant in the Salt Lake City Green Team, a community group that was organized to look at long-term ways to protect the environment and make Salt Lake a more sustainable community.
Reasons for CHP:
Reducing operating costs was one of the primary drivers for building the cogeneration facility. Tesoro’s cost to generate electricity depends largely on the cost of natural gas. Currently they can produce energy for $35 to $40 per MW which has enabled Tesoro to save $200,000 per month on its energy bill. Additionally, they sell $300,000 of energy per month to Utah Power, making a monthly net improvement to its operations of $500,000. Improving reliability of its power supply was another key driver. The refinery is located in Utah Power’s rapidly expanding load center where investment in transmission infrastructure has not kept up with demand. This resulted in power outages that were disruptive to the refineries 24/7 operations. Other important drivers included the need to replace vintage 1940’s boilers and a desire to be more efficient and environmentally conscious.
CHP System Equipment & Configuration:
The cogeneration facility uses two SoLoNOx Titan T-130 Gas Turbine Generator Units (GTGU’s) and two Heat Recovery Steam Generators (HRSG’s). The
refinery is able to operate on the power and steam produced with an excess of electricity that is sold to the utility grid. Power may also be imported from the
grid if one of the Cogen trains is down for maintenance. Power is
...